Run and Test Integrations for Healthcare Productivity

Uruchom integracje, aby sprawdzić, czy konfiguracja jest prawidłowa.

Test the integrations

Run each integration to test that the configuration is correct.

Uwaga: Only for integrations that have import and export versions, you can run the import integration, then run the corresponding export integration to check the output file and make sure that the import processed the records correctly. Example: Run Work Unit Work units (WU) define departments, work groups, and combine business structure nodes or jobs into single entities for productivity analysis. All Healthcare Analytics reports require work units. Import, then run Work Unit Export and check the output file.

Uwaga:

The maximum size of a cross-reference table is 1 MB or 10,000 rows.

Examples: You cannot download a table that is larger than 1 MB and has fewer than 10,000 rows; or that is smaller than 1 MB but has more than 10,000 rows.

Check the results

Uwaga:
  • To manage the large number of Healthcare Productivity integrations, organize the related and inter-dependent integrations within integration sets. See the Configure Integration Sets for Healthcare Productivity topic.
  • Można zaplanować integracje i zbiory integracji, aby uruchomić je później jednorazowo lub cyklicznie. Zobacz temat Schedule Integrations.

  • If changes are made to volume, payroll, or agency configurations, you can process the historical data again to fit the new configuration. See the Recalculate Healthcare Productivity topic.